![]() Wayne field/park for a new, bigger detention system. ![]() inappropriate stormwater management and development in the township), the Commissioners have been considering a variety of proposals that would utilize almost the entire N. In response, rather than propose repairing the basin and addressing the root cause of flooding in North Wayne (i.e. While there exists a small basin on a portion of the property, disrepair has prevented it from functioning as needed. Since at least 2014, Radnor Township has been proposing to construction a new detention basin in North Wayne Park, Radnor Township, PA as a solution to downstream flooding. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |